This job has expired

This position was posted on March 28, 2026 and is likely no longer accepting applications. We've kept it here for historical reference. Check out the similar jobs below!

FluidStack Inc. logo

Data Center Construction Manager

Job Overview

Location

Austin, TX

Job Type

Full-time

Category

Engineering

Date Posted

March 28, 2026

Full Job Description

đź“‹ Description

  • • As a Data Center Construction Manager at FluidStack Inc., you will own the end-to-end execution of green-field and brown-field GPU data center builds worldwide, ensuring the delivery of mission-critical infrastructure that powers advanced AI workloads for industry leaders like Meta, Mistral, and Black Forest Labs. Your role is pivotal in translating FluidStack’s vision of abundant intelligence into physical reality by overseeing safe, on-schedule, and on-budget construction that meets extreme power and cooling density requirements.
  • • You will build, maintain, and execute integrated project schedules using Primavera P6 and MS Project, covering all phases from design and procurement through construction and commissioning, while proactively identifying delays and issuing recovery plans to keep fast-track global projects on target.
  • • Enforce FluidStack’s safety program with a relentless focus on achieving a zero-incident culture across all subcontractors and trades, conducting regular safety briefings, audits, and ensuring compliance with OSHA 30, NFPA 70E, and local jurisdictional codes.
  • • Coordinate CSA (Civil, Structural, Architectural) and MEP (Mechanical, Electrical, Plumbing) trades in real time, resolving field conflicts, managing interface points, and verifying that installations meet FluidStack’s stringent technical and performance specifications for high-density GPU environments.
  • • Track and report daily progress, spend, earned value, and resource loading; manage change orders, RFIs, material submittals, and QA/QC processes to maintain financial and schedule integrity across multiple concurrent projects.
  • • Serve as the primary liaison between Design, Procurement, Commissioning, and Operations teams to ensure seamless hand-offs, validate constructability, and align execution with long-term operational readiness and performance benchmarks.
  • • Lead the development of scopes of work, technical exhibits, and contract packages for critical path trades, managing construction contracts from award through close-out to ensure compliance with budget, schedule, technical specs, and FluidStack’s quality standards.
  • • Oversee contractor adherence to deliverables, payment terms, reporting cadence, and site-specific safety and security protocols, conducting regular performance reviews and holding vendors accountable for quality and timeliness.
  • • Interpret BIM/Revit models and IFC packages on-site to validate design intent, detect clashes early, and guide field decisions, ensuring that as-built conditions align with design documentation and FluidStack’s infrastructure standards.
  • • Travel 50% or more to active construction sites domestically and internationally, providing hands-on leadership, mentoring junior staff, and representing FluidStack’s standards in high-pressure, fast-moving construction environments.
  • • Join a purpose-driven, high-velocity team committed to accelerating the future of intelligence, where your work directly enables breakthroughs in AI research and deployment by delivering the physical infrastructure that makes large-scale model training and inference possible.
  • • Develop expert-level competence in hyperscale data center construction, gaining rare experience in managing extreme-density GPU facilities at the forefront of AI infrastructure innovation, positioning you as a leader in mission-critical facility delivery.

🎯 Requirements

  • • B.S./B.E./B.A. in an engineering discipline with preferred construction management certification or equivalent qualification.
  • • 7+ years of proven experience managing hyperscale, semiconductor, or mission-critical construction projects, preferably in data centers or high-tech industrial facilities.
  • • Deep knowledge of CSA and MEP construction phases, procurement workflows, cost controls, and experience delivering fast-track projects across multiple geographies.
  • • OSHA 30 certification (or equivalent) and strong familiarity with NFPA 70E, local building codes, permit processes, and industrial safety standards.
  • • Ability to read and interpret BIM/Revit models and IFC packages in real time to support field decision-making and clash detection.
  • • Willingness and ability to travel 50% or more to active project sites as required.

🏖️ Benefits

  • • Competitive total compensation package including base salary ($120,000–$200,000) and equity in the form of stock options.
  • • Retirement or pension plan aligned with local norms and regulations.
  • • Comprehensive health, dental, and vision insurance coverage.
  • • Generous paid time off (PTO) policy in accordance with local standards.

Skills & Technologies

Onsite
$120k-200k

Ready to Apply?

You will be redirected to an external site to apply.

FluidStack Inc. logo
FluidStack Inc.
Visit Website

About FluidStack Inc.

FluidStack Inc. operates a distributed cloud platform that aggregates under-utilized GPUs in data centers and individual machines worldwide, renting them on-demand to AI researchers, startups, and enterprises for training and inference workloads. The company automates deployment, security, and billing, offering prices up to 80% below traditional hyperscalers while providing instant access to high-end NVIDIA A100, H100, and consumer GPUs through a single API and web console. Headquartered in London, FluidStack targets machine-learning engineers who need scalable, low-cost compute without long-term commitments, claiming thousands of active nodes and customers including Fortune 500 enterprises and leading research labs.

Get more remote jobs like this

Subscribe to the weekly newsletter for similar remote roles and curated hiring updates.

Newsletter

Weekly remote jobs and featured talent.

No spam. Only curated remote roles and product updates. You can unsubscribe anytime.

Similar Opportunities

Abridge AI, Inc. logo

Abridge AI, Inc.

SF Office
Full-time
Expires Jul 20, 2026
Python
Terraform
GitHub
+4 more

17 days ago

Apply
Expired
Remote - United Kingdom
Full-time
Expired May 18, 2026
Remote
Degree Required

3 months ago

Apply
Expired
APAC | Remote
Full-time
Expired May 20, 2026
Python
JavaScript
TypeScript
+4 more

3 months ago

Apply
Expired
Credit Acceptance Corporation logo

Credit Acceptance Corporation

USA - Remote
Full-time
Expired May 21, 2026
Express
Remote
$208k-306k
+1 more

3 months ago

Apply